...
- Label all cables, patch panels, wall outlets, etc., as specified
- Ensure cables are secured to supports (J-hooks, ceiling truss, etc.)
- Conceal cables where possible/required
- Leave properly coiled and dressed service loops at controller location and head end as required
- Test all terminations and document results as specified
- Document cable test results as specified (if certification is required)