Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Physical access to your new panel is secured through the keyed lock mechanism located either at the top front (EnterphoneTM 19), or side front (EnterphoneTM iQ).

  • To ensure proper operation of the locking mechanism, ensure that the lock strike remains perpendicular to the leading edge of the panel when the unit is open and showing the strike. If the lock strike is not in the correct position the mechanism may not effectively lock the panel.

  • It is strongly recommended that keys be copied after purchase and placed in a documented and secured location to allow access to the panel as needed. Loss of keys will require physical removal and replacement of the lock at the expense of the customer. Lock replacement or modification must be completed by a technician approved by Identiv. Any uncertified or third-party modification of the lock mechanism will immediately void the manufacturer's warranty.

...

Identify the appropriate mounting diagram for your Enterphone product below.

Enterphone iQ

Image RemovedImage AddedImage Added
Image Removed

Enterphone 19

Image Modified

Choosing an appropriate install location

...

  1. Use the correct mounting diagram to measure the mounting hole locations.

  2. For screws into wall studs, drill a pilot hole 2 inches deep using a 7/32″ drill bit.

  3. For screws using drywall anchors, drill a pilot hole 2 inches deep using a 7/32″ drill bit.

  4. Your Enterphone product has three cut-outs on the back for cable routing. Identify which cut-out or cut-outs you will use, and make any necessary cut-outs in the wall.

...